Foundation up!
I have most of a foundation.
First they finished forming up the walls and tying in re-bar, and then poured concrete.
Then they removed the form boards.
They installed waterproofing and a drain mat.
First they finished forming up the walls and tying in re-bar, and then poured concrete.
Then they removed the form boards.
They installed waterproofing and a drain mat.
Next is backfilling the foundation, and pouring the floor slab (after insulating and laying radiant heat tubes).