Foundation up!

I have most of a foundation.

First they finished forming up the walls and tying in re-bar, and then poured concrete.


Then they removed the form boards.



They installed waterproofing and a drain mat.



Next is backfilling the foundation, and pouring the floor slab (after insulating and laying radiant heat tubes). 

Comments

Popular Posts